Archives / Past Events

Past Events

March 2026 Tour

Chapter Tour

March 5, 2026
4:00 – 5:30 PM

Location: 2831 Poplar Street
Highland, IL 62249

Highland Primary
Tour the newly completed Highland Primary!

Members & School Districts: Free | Non-Members: $20


Chapter Event

November 5, 2025
4:00 – 5:30 PM Central

Parkway South High School
801 Hanna Road
Manchester, MO 63021

Member: $10 | Non-Member: $25 | Public Sector: FREE


Event

Chapter Event

August 7, 2025
9:00 – 10:30 AM Central

Location: Maplewood – Richmond Heights High School
7500 Lohmeyer Ave, Maplewood, MO 63143

AI for Administrators with Spark AI Strategy
Focus Areas & Topics
  • Demystifying AI
  • Meet Your Co-Pilots
  • Essential Skills for Effective Use
  • Data Privacy, Ethics, and Responsible AI in Schools
  • AI in Action – Administrative Use Cases in Your School
  • Navigating the Now & Next – Student AI Use & Future Mandates
  • Hands On AI Lab

Members: $40 | Non-Members: $70


Chapter Event

April 2, 2025
4:00 – 6:00 PM Central Time

Lindbergh High School Idea Center
5000 S Lindbergh Blvd, Sappington, MO 63126

Designing the Next Effective Schools
This talk looks at the design success of schools in the area over the last two decades, and how these changes have changed the way that teaching and learning have been allowed to happen. It then pivots to the uncertainty of the future learning model, and a look at how design concepts will need to change to sync with future focused learning.

Learning Objectives:
  • Looking at successful designs in the last two decades.
  • How these changes effected the teaching and learning in those spaces.
  • Looking at the uncertainty of the future learning model, and a look at how design concepts will need to be changed to sync with future focused learning.

Project Team:
Architect of Record: Cordogan Clark / Perkins & Will
Landscape Architect: Gateway Design Studio
Structural Engineer: KPFF Consulting Engineers
Electrical & Mechanical Engineer: McClure Engineering
Civil Engineer: Civil Engineering Design Consultants
Contractor: BSI Constructors Inc
Owner: Lindbergh School District

Presenter:
Dr. Robert Dillon is an author, speaker, educator, and lifelong learner. His twenty plus years in education has seen him serve kids and families as a teacher, principal, technology director, and innovation leader. His primary focus is working to bring synergy to instructional design, technology infusion, and learning space design.

Members: Free | Non-Members: $20


Happy Hour

Holiday Happy Hour

December 5, 2024
4:00 – 6:00 PM Central

Rockwell Brewery
Rockwell Brewery
1320 S Vandeventer Ave
St. Louis, MO 63110

Join us at Rockwell Brewery on December 5, 4-6 pm for food, drinks, and discussion about our local learning environments! Also, please bring a toy for our Toys for Tots drive!

Members: FREE | Non-Members: $20.00





Chapter Event

September 10, 2024
12:30 – 2:30 PM Central Time

West Lane Elementary
338 N. West Lane, Jackson, MO 63755
Check in at front office and then proceed to the gymnasium.

Securing our Future: Navigating the Path to Safer Schools for New and Existing Storm Shelters
Join us for an informative panel discussion on Storm Shelters and Schools. Experts will delve into design, protocols, and the importance of preparedness. Following the discussion, take an exclusive tour of the school’s storm shelters. Experience firsthand the security measures in place to ensure student safety. The event will conclude with a lunch, fostering networking and further discussion on creating secure learning environments for our future generations.

West Lane
West Lane West Lane

Learning Objectives:
  • In an era where safety and preparedness are more crucial than ever, our schools stand at the forefront of adopting innovative solutions to protect our children and educational communities. "Securing Our Future: Navigating the Path to Safer Schools for New and Existing Storm Shelters" is a must-attend panel discussion designed for educators, administrators, architects, and engineers who are dedicated to creating a secure learning environment against the unpredictability of severe weather events.
  • This panel discussion will explore the essential distinctions between Safe Rooms and Storm Shelters, providing a clear understanding of how each can be integrated effectively within educational settings. With the ever-changing landscape of safety codes, we will navigate the complex requirements that mandate the inclusion of storm shelters in schools, offering insights into how these regulations can be met with innovative design and planning.
  • We will look at the myriad of grant opportunities available to fund these critical safety enhancements. Our experts will guide you through the process of identifying, applying for, and securing financial support to make these essential projects feasible for your district. We will share industry best practices and real world success stories, illustrating how schools across Missouri have successfully implemented storm shelters and safe rooms. From initial concept to completion, learn how these projects not only enhance safety but also serve as multi-functional spaces that contribute to the educational mission.
  • Join us for "Securing Our Future: Navigating the Path to Safer Schools for New and Existing Storm Shelters" and take the first step towards transforming your school into a beacon of safety and resilience. Discover how you can leverage cutting-edge strategies, funding opportunities, and community support to safeguard your students and staff against the unexpected, ensuring peace of mind for parents and the community at large. Attendees will leave equipped with the knowledge, resources, and inspiration needed to champion these vital projects within their own districts. Don't miss this opportunity to be part of the movement towards a safer, more secure future for our schools.

Project Team:
Architect of Record: incite Design Studio
Structural Engineer: Toth and Associates
Electrical & Mechanical Engineer: ECS
Civil Engineer: Koehler
Contractor: Brockmiller Construction, Inc.
Specialized Consultants: Grant Writer – Toth and Associates
Owner: Jackson R-II School District

Presenters:
Dr. Keenan Kinder has 27 years in education, 19 years of which have been in administration with Operations and Buildings. Dr. Kinder is also a very proud alumni of the Jackson R-II School District and has served the district as an administrator for the past 5 years.

Brian Orr, PE is a principal at Toth and Associates, Inc. in Springfield, Missouri. Mr. Orr has been working on safe room designs for over 20 years and is on the technical steering committees for the FEMA P-320, P-361, and P-431 updates.

Teresa Lehman has over 35 years of accounting and grant writing/grant administration experience. Ms. Lehman began her career at Toth and Associates performing cost of service studies and rate analysis and design for cooperatives and municipals in Missouri and Arkansas. Since then, she has expanded her project experience to include grant writing, submission, and management.

Mike Hilmes with Incite Design Studio has been in architecture for 30 years, 28 of which have been in the educational world. Mr. Hilmes opened the St. Louis office for iDS in 2017 as the studio director and is now serving as the client relationship manager. Utilizing his passion for the design and construction of educational spaces, he is currently serving as the St. Louis Chapter President of A4LE.

Mark Reuther has been with Hoener Architects since 1992 and performed lead Principal services since 2003 for a wide variety of clients served by Hoener. Mr. Reuther has successfully delivered projects of varying sizes including FEMA Storm Shelters to clients in the educational market with a focus on public school districts in St. Louis and the surrounding areas.

Members: Free | Non-Members: $20

Event Sponsors:
Brockmiller Construction Hoener incite Design Studio
Shaw Contract Toth


Happy Hour

Chapter Social Hour

Thursday, June 27, 2024
4:00 – 6:00 PM

Helen Fitzgerald’s
3650 S Lindbergh Blvd
St. Louis, MO 63127

JOIN US! Unwind and mingle at our upcoming A4LE Happy Hour! Enjoy refreshing drinks, delicious appetizers, and great company in a vibrant atmosphere.

The event is free to all, but you must register on the A4LE website.

We hope to see you there!


Event Sponsors:
Lighting Assoc Smith System


Building Tour

December 13, 2023
12:45 PM – 2:15 PM CDT

Lindbergh High School
5000 Lindbergh Blvd
St. Louis, MO 63126

Join us for a tour of the new Lindbergh High School facility and see how their learning environment has evolved. This event is designed for educators, educational design and construction professionals, facilities personnel, and interested members.

Learning Objectives:
  • Understand how the design of the renovated high school provides significant improvements to building security, a priority of the project. The former campus consisted of several detached buildings with dozens of individual doors. The new building is designed so that students and visitors have one point of entry, increasing safety and security.
  • Outline the innovative design strategies that allow the renovated high school to better prepare students for the 21st century; for example, teaching spaces with garage doors encourage students to move into collaboration areas and extend education beyond the classroom.
  • Discuss ways in which the building design supports progressive curriculum and scheduling changes implemented by the District to provide students with flexibility and autonomy; for instance, Lindbergh utilizes a Power Lunch hour that allows all 2,300 students to eat at the same time. They are not limited to the cafeteria and can break out to other areas of the building, creating a more collegiate feel.

Lindbergh High School
Lindbergh High School Lindbergh High School
Lindbergh High School Lindbergh High School

Project Team:
Architect of Record: Cordogan Clark, Perkins & Will
Landscape Architect: Gateway Design Studio
Structural Engineer: KPFF Consulting Engineers
Electrical Engineer: McClure Engineering
Civil Engineer: Civil Engineering Design Consultants
Mechanical Engineer: McClure Engineering
Contractor: BSI Constructors Inc.
Owner: Lindbergh School District

Presenter:
Dr. Tara Sparks, Chief Academic Officer, Lindbergh School District

Schedule:
12:45 – 1:00 PM Gather together at the entrance to the Commons under the arched canopy outside. Then we will be led to a conference room where a short presentation will begin.
1:00 PM Brief Discussion (starts promptly at 1 PM) – Key Design Elements and Design Challenges.
1:15 – 2:15 PM Project Tour – Observe the integration of design concepts meant to create security, effective learning outcomes, and foster collaboration.

Members: Free | Non-Members: $20
Sponsorship Opportunities Available!


St. Louis Chapter Inaugural Event

June 20, 2023
2:00 PM – 3:30 PM Central Daylight Time

Please join us as we create a new local chapter in A4LE. Get in on the ground floor and help us enhance learning environments across the area. We NEED your thoughts, ideas, and perspectives to make this chapter a success. Come be a part of this group of educators, designers, builders, and vendors. We want to offer ideas, discuss problems and solutions, talk about accomplishments and failures, all to help better educate generations of future learners, AND facilitate educators and administrators in their work environment.

This inaugural event will be held at Hixson Middle School in the Webster Groves School District at their new Library and Media Center. Hixson Middle School was part of a district-wide planning exercise to accommodate grades 6, 7, and 8. The existing facility was originally constructed as a junior high school and required partial renovation and several new building additions to accommodate the increased population.

Join us for a tour of the project at 2:00 PM and an A4LE kick-off conversation afterwards.

Free to attend!
Event Sponsor: $250

Hixson Middle School Tour
630 S Elm Ave, Webster Groves, MO 63119

During a district-wide planning exercise conducted in 2018, it was recommended that Hixson Middle School be modified and expanded so that it could accommodate grades 6, 7, and 8. For Hixson to receive sixth-grade students from the district’s intermediate school, the existing facility originally constructed as a junior high school in 1954-55, would require partial renovation and several new building additions to accommodate the increased population. Upon completion of a facility master plan, it was concluded that a new 45,000 square foot, two-story academic wing would be developed which would allow the school to be configured into three independent grade-level houses that would support middle school curriculum. A new multi-purpose gymnasium that also serves as a storm shelter for the building’s occupants was incorporated into the design thus providing appropriate space for physical education and extracurricular events. Other building additions included a new music wing, a new girl’s locker room and expansion of the existing student cafeteria.

Hixson Middle School Hixson Middle School

The previous library was replaced with a new library/media center that complies with the space recommendations suggested by the Missouri Department of Secondary Education. Merged in one new addition, this wing has become the new main entrance to Hixson Middle School.

Completed in 2021, Hixson Middle School with an overall building area of 176,155 square feet has a student capacity of 1,125 students (375 per grade) and was constructed at a cost of $17,474,423.

Event Sponsors
incite Design Studio Hoener Smith System

Become a Member

Join

ALEP / Certificate Programs

 
ALEP® / A4LE ACADEMY

Comprehensive industry education: ALEP and Advanced Certificate Program

MORE

Online Awards

 
AWARDS

Visit our showcase of past online
entry submissions

VIEW

LearningSCAPES 2026

 
LEARNINGSCAPES 2026

November 4-7, 2026
Seattle, WA

REGISTER